PhET Progress Report

Sam Reid

May 3, 2007

 

An online version of this report is available here.

Here�s a pie chart representation of the time distribution.

 

Energy Skate Park

         Posted 3 revisions, latest is:

http://www.colorado.edu/physics/phet/dev/ec3/1.05.27/

         Added a threshold to prevent tiny bounces

         Added restore point for �return skater� or �bring back��

         Lots of tiny user interface and graphics fixes (see changes.txt linked above)

         Recommend the rest of the team look at this before thorough investigation; also recommend thorough investigation is incremental and collaborative, instead of a large batch operation.

         This simulation is ready for phet-team testing and/or user testing.

         Should I look through Keller�s previous comments for recommendations that still apply?

 

Slider (new controls implementation)

         Discussion with Chris about new controls design

         Tested new controls

         Converted Energy Skate park to use new controls

 

Build Process

         Discussion with Chris

 

Piccolo

         Discussed Piccolo 2.0 option with Piccolo authors

         Piccolo team has agreed to sponsor our recommendations

         Piccolo team granted write access to piccolo repository.

 

Upcoming Work

         Energy Skate Park?

         Rotation (partly with John)

         Improve build system (with John)

1.      Rewrite main build script to use java-based build task

2.      Generalize JNLP file generation

3.      Fix simulations to match build information requirements (directory for localization information, standardization, etc.)