Energy Skate Park

·         Posted 3 revisions, latest is:

http://www.colorado.edu/physics/phet/dev/ec3/1.05.27/

·         Added a threshold to prevent tiny bounces

·         Added restore point for “return skater” or “bring back…”

·         Lots of tiny user interface and graphics fixes (see changes.txt linked above)

·         Recommend the rest of the team look at this before thorough investigation; also recommend thorough investigation is incremental and collaborative, instead of a large batch operation.

·         This simulation is ready for phet-team testing and/or user testing.

·         Should I look through Keller’s previous comments for recommendations that still apply?

 

Slider (new controls implementation)

·         Discussion with Chris about new controls design

·         Tested new controls

·         Converted Energy Skate park to use new controls

 

Build Process

·         Discussion with Chris

 

Piccolo

·         Discussed Piccolo 2.0 option with Piccolo authors

·         Piccolo team has agreed to sponsor our recommendations

·         Piccolo team granted write access to piccolo repository.

 

Upcoming Work

·         Energy Skate Park?

·         Rotation (partly with John)

·         Improve build system (with John)

1.      Rewrite main build script to use java-based build task

2.      Generalize JNLP file generation

3.      Fix simulations to match build information requirements (directory for localization information, standardization, etc.)