PhET Progress Report
April 26, 2007
An online version of this report is available here.
Here’s a pie chart representation of the time distribution.
Energy Skate Park
· Posted 3 revisions this week, latest version is http://www.colorado.edu/physics/phet/dev/ec3/1.05.23/
· Finished all requests from April 12 meeting
· Bugfix in record/playback & save/load in web start version.
· Standardize build process
· Click here for a detailed list of changes.
· Click here for some feature requests to discuss.
Build Process
· Collaborated with John to improve design of Java-based build process.
· Still needs to be integrated with entire build process
JNLP Generation/Flavor Support
· Improved build process to support multiple flavors of a simulation.
· Titles are localized
· Still needs to be polished (improved design, error handling, etc.) but it’s working.
· Information for each simulation needs to be put in this format.
Rotation
· Consolidate & move resources
· Internal fixes (minor)
Upcoming Work
· Improve build system (with John)
· Energy Skate Park?
· Rotation (partly with John)