PhET Progress Report
Sam Reid
March 8, 2007
An online version of this report is available here.
Here’s a pie
chart representation of the time distribution.
Energy Skate Park
- About
14.5 hours of work this week.
- http://www.colorado.edu/physics/phet/dev/ec3/1.05.08/
- Collaborated
with Dubson
- Added
multiple splines
- Finished
computation for leaving the track.
- Added
test selection
- Added
curvature indicators
- Added
offset tracks
- Projected:
57.5 hours to go (based on last week’s estimate)
- Issues
- What
about the possibility of putting the center of mass directly on the
track? (Roller coaster, different
graphic, etc..?)
Repository
- “Defragmented”
source code that was scattered about
- Moved simulations
so they can be used together
Piccolo/Plum Pudding
- Collaborated
with Chris
- Devise
a way to improve performance under certain circumstances in piccolo
- Needs
generalization
Upcoming Work
- Energy
Skate Park
a.
Collaborate with Dubson to improve physical model
b.
Evaluate new physical model before working on any
physics-related bugs.
c.
Track should bump up when beneath ground
- Collaborate
with De Goes to improve simulation build process & isolate
dependencies.
- Rotational
Motion Simulation I
a.
Time series/playback
b.
Lots of minor user interface updates
c.
Performance enhancement
- Rotational
Motion Simulation II
- CCK…