PhET Progress Report

Sam Reid

October 11, 2007

 

An online version of this report is available here.

Here�s a pie chart representation of the time distribution.

 

Translation

         Discussed with John, Chris, Mike

         Made translated sim names available to website (on redeploy)

 

Soluble Salts

         Meeting with Loretta and Sevil

         Familiarize with code briefly

         Deployed dev version with options menu enabled

 

Software Meeting

         Discuss improvements for phetcommon & sim design with John & Chris

 

Wave Interference

         Latest version

         10-5-2007: reduced padding between components to remove scrollbars at 1024x768

         10-5-2007: reduced barrier thickness

         10-5-2007: reduced graph size slightly

         10-5-2007: added option to maximize/minimize wave graphic

         Waiting for approval for main site

 

CCK

         Deployed to main site

 

Misc

         Phetcommon � discussed with Chris

         Documentation

         Torque�added trial introduction module

         Website

         Semiconductors�fixed about dialog, fixed battery spinner

o   Waiting for approval for main site

 

Upcoming Work

         Rotation/Torque

         Localization Interface for PhET Simulations

         CCK

         Collaborate with John on States-Of-Matter

         Licensing issues/Meet with Kate Tallman